NEW--- Cambridge Recreation Complex

The Cambridge Recreation Complex is taking shape at 655 Wesley Boulevard and will soon become a vibrant new destination for recreation, wellness, learning and community connection in the city’s growing southeast area.

Now under construction, this modern community hub is designed to bring people of all ages and abilities together in one welcoming, accessible space. Once complete, the facility will include a 10-lane, 25-metre pool, a warm-water leisure pool, three FIBA gymnasiums, an indoor running and walking track, fitness space, multi-purpose rooms, concession space, park amenities, outdoor pickleball courts and a new Cambridge Public Library branch.

The complex will be part of a 32.5-acre joint-use campus created through a partnership between the City of Cambridge, Waterloo Catholic District School Board, Waterloo Region District School Board and Cambridge Public Library. The campus brings together the recreation complex and library with a separate shared school facility for Giinawind Public School, Guardian Angels Catholic Elementary School and YWCA Cambridge Greengate Child Care centre. With select shared amenities, outdoor spaces and a new community park, the site is designed to make the most of public spaces and create a welcoming destination for the neighbourhood.

Located close to the growing South Point residential development, the campus will create new opportunities for residents to swim, play, train, gather, learn and connect close to home.

Whether visitors are coming for a swim, a workout, a basketball game, a library program, a walk on the track or time with family and friends, the Cambridge Recreation Complex will offer something for everyone.

The Cambridge Recreation Complex is expected to open in early 2027.

Part-Time Opportunities at the Rec Complex

Are you interested in working at the Recreation Complex?

We will be hiring for many part-time positions in everything from aquatics and fitness programming to reception and facility management. Sign up for our email list to receive updates as part-time jobs are posted.

Project Updates

Project timeline showing six phases: facility planning, detailed design, project tendering, facility construction, testing, training and setup, and facility opening. A highlighted marker indicates the project is currently in the facility construction phase.

Construction Progress to Date

As of August 2026:

  • Facility structure and foundation are built
  • Exterior brickwork is underway
  • Mechanical and electrical systems are underway
  • Pool forms are in place and leak tests have been completed
  • Tiling and drywall are underway
Upcoming Work

In the coming weeks, we will begin:

  • Exterior paving and landscaping
  • Preparing the pools for tiling

Project Background

In 2014, the City completed a Recreational Facilities Master Plan recommending a large, multi-purpose sport and recreation facility to meet current and future community needs.

Two Council-appointed task forces helped shape the vision:

The first task force gathered extensive public input to determine the facility’s main components.
In May 2016, Council approved a concept including:

  • Aquatic centre with a 25 m, 10‑lane pool, warm-water/therapeutic pool, leisure pool, and spectator seating
  • Triple gymnasium
  • Walking track
  • Multi-purpose rooms and display space
  • Four NHL-sized ice pads (later removed, as ice facilities were planned elsewhere)

The second task force led a community consultation and site evaluation process, with members from Council, staff, the public, and the Chamber of Commerce.

In 2017, Council directed staff to explore partnerships for recreation facilities, issuing a Request for Expression of Interest (RFEOI 2017-56). Council began discussions with Morguard Real Estate Investment Trust (REIT) regarding potential facilities at Cambridge Centre, but ended the RFEOI process in February 2019.

In 2019, Council refocused planning on City-owned lands in southeast Galt on 2.5 acres purchased in 2007 for a joint community campus including:

  • A new recreation complex
  • A new Cambridge Public Library branch
  • New WRDSB and WCDSB schools

This “Joint Use Campus” aligns with provincial policy encouraging community hubs. Once surrounding neighbourhoods are fully developed, up to 26,500 residents are expected to live within 1.5 km of the site.

Public input was collected through open houses and delegation nights in May 2019.

Council approved a strategy to:

  • Build a new recreation complex on the southeast Galt lands
  • Expand Preston Memorial Auditorium into a twin-pad facility
  • Plan for the future decommissioning of John Dolson Centre Pool, Karl Homuth Arena, Duncan McIntosh Arena, and Dickson Arena as new facilities open
  • Review a proposal to expand Cambridge Sports Park to four ice pads
  • Explore opportunities for a regional 50 m pool within the Region of Waterloo

In 2020, the City began a joint feasibility study with WRDSB, WCDSB, and Cambridge Public Library to explore shared facilities on the Joint Use Campus. Council approved the study in February 2021 and endorsed the joint campus design approach.

In May 2022, in response to construction market volatility, Council directed staff to prepare two design options of varying scope. Detailed design and costing will continue throughout the project to ensure the City stays within budget. The City remains committed to delivering an affordable, accessible, and community-focused recreation complex that supports residents, sports groups, youth and future growth. 

Frequently asked questions

Change areas will feature a mix of private and common spaces and will be open to use by everyone.

Lockable changerooms offer comfort and privacy for users to change their clothes, while shared locker and rinse areas will improving use for families, groups, and persons requiring assistance, ensuring a welcoming and accessible environment.

Just as they would in the rest of the facility, patrons will be required to be fully clothed or in a swimsuit when in shared spaces, including locker areas. Nudity will not be permitted.

Much like change areas, washrooms at the Recreation Complex will feature a mix of private and common spaces and will be open to everyone. Individual, lockable stalls offer privacy for users, while sinks, mirrors and hand dryers will be in a common space for all to share.

While locker areas and handwash stations will be in common spaces, individual change rooms and washroom stalls will offer full privacy, and users are required to be fully clothed in any shared spaces.

These private spaces have been designed with a higher standard of privacy than found in most gender-designated washrooms and change rooms to help achieve comfort, while creating openness in adjacent areas to promote safety and visibility. The change room walls extend from the floor, up to 8 feet high.

The change room is designed with flexibility to allow half of the space to be dedicated to a specific group during special events or programs.

Yes! Four dedicated change rooms will accommodate people with limited mobility, including two barrier free change rooms and two change rooms.