North Cambridge Secondary Plan

The City of Cambridge has re-initiated the North Cambridge Secondary Plan (Secondary Plan) within the East Side Lands - Stage 2 Master Environmental Servicing Plan (MESP) area.  The Secondary Plan is being completed as part of a larger MESP process being undertaken with the Region of Waterloo.  The purpose of the MESP is to assist in identifying which lands should be added to the Urban Area boundary and how the lands will be planned and serviced in a fiscally and environmentally responsible manner.  The process involves an integrated approach to land use planning, water/wastewater servicing, utilities, transportation, and environmental planning.  For more information on the East Side Lands – Stage 2 MESP see the Region of Waterloo's Growth Management - East Side Lands page.

The Secondary Plan includes lands north of Middle Block Road, east and south of Riverbank Drive, south of Fairway Road and east and west of Fountain Street North.  The Secondary Plan will be prepared as an amendment to the City of Cambridge Official Plan.

Virtual public open house (November 25, 2021)

Statutory public meeting (June 28, 2022)

A statutory public meeting was held to introduce the proposed North Cambridge Secondary Plan Official Plan Amendment.

For information on this project or to be added to the mailing list please contact Kathy Padgett (PadgettK@cambridge.ca)

Study Area