Project Overview
The City of Cambridge completed an Environmental Assessment (EA) Study for a transportation assessment of Beverly Street between Dundas Street North and Elgin Street North. The approved improvements accommodate all road users and meets the community design objectives. The project is in the stage of detailed design and approvals.
Progress to Date
- 100% Detail design completed.
Upcoming Work
- Phase 1 Construction - Construction of CP underpass 2023
- Phase II Beverly Street Reconstruction -2023
- Both Phase I & II of the project will be tendered in Spring 2023
Study Area
Figure 1: Beverly Street Reconstruction Phase 1- Construction of Pedestrian Underpass at CP rail crossing.
Documents, reports and updates
- EA Project File Final Draft
- Draft Study Design
- Public Consultation Centre 1 Presentation Material
- Public Consultation Centre 2 Presentation Material
Contact Information
Prasad Samarakoon, P.Eng
Project Engineer
City of Cambridge
T.: (519) 623-1340 Ext. 4539
samarakoonp@cambridge.ca
Steve Taylor, P.Eng.
EA Project Manager
BT Engineering
T.: (519) 672-2222
stevenj.taylor@bteng.ca