| DOCUMENT |
DESCRIPTION |
DATE POSTED |
|
| Asset Management |
| Federal Gas Tax Update |
September 2010 report providing an update on Federal Gas Tax and the City of Cambridge's Asset Management Division | 2010-09-21 |
PDF 95Kb |
| City of Cambridge Stormwater Management Master Plan |
| City of Cambridge Stormwater Management Master Plan Final Report |
Evaluating existing infrastructure & policies, identify drainage system deficiencies, and develop an implementation plan for a long term sustainable program. | 2011-08-29 |
PDF 528Kb |
| Stormwater Master Plan Drawings Set 1 |
flooding locations and prioritization drawings | 2011-08-29 |
PDF 18459Kb |
| Stormwater Master Plan Drawings-Set 2 |
Retrofit, Maintenance and Interstitial Drain drawings | 2011-08-29 |
PDF 9047Kb |
| Stormwater Management Policies & Guidelines |
Policies and guidelines to assist the development industry and City staff with the technical and aesthetic design of stormwater management systems in the City of Cambridge | 2011-08-29 |
PDF 9008Kb |
| June 23 SWM Master Plan - Second PIC - Environmental Inventory |
| 2009-06-25 |
PDF 8514Kb |
| June 23 SWM Master Plan - Second PIC - Comment Sheet and Handout |
| 2009-06-25 |
PDF 187Kb |
| June 23 SWM Master Plan - Second PIC - Storyboards and Presentation |
| 2009-06-25 |
PDF 10441Kb |
| June 23 SWM Master Plan - Second PIC - SWM Facility and Separator Location Plan (Dwg. 2) |
| 2009-06-25 |
PDF 3929Kb |
| June 23 SWM Master Plan - Second PIC - SWM Treatment Area Plan (Dwg. 3) |
| 2009-06-25 |
PDF 3977Kb |
| June 23 SWM Master Plan - Flood Locations (Dwg. 4) |
| 2009-06-25 |
PDF 2807Kb |
| June 23 SWM Master Plan - Second PIC - Field Recon. at Reported Flood Sites (Dwg. 5) |
| 2009-06-25 |
PDF 1840Kb |
| June 23 SWM Master Plan - Detailed Flood Assessment (Dwg. 6) |
| 2009-06-25 |
PDF 9345Kb |
| June 23 SWM Master Plan - Trunk Sewer ID Plan (Dwg. 7) |
| 2009-06-25 |
PDF 2343Kb |
| June 23 SWM Master Plan - Hydraulic Structure Location Plan |
| 2009-06-25 |
PDF 3018Kb |
| June 23 SWM Master Plan - Retrofit Sites (Dwg. 9) |
| 2009-06-25 |
PDF 2242Kb |
| Notice for June 23 Stormwater Management Master Plan PIC |
| 2009-06-11 |
PDF 21Kb |
| Cambridge SWM - Zoning (1997) |
| 2007-11-30 |
PDF 8769Kb |
| Cambridge SWM - Environmental Inventory |
| 2007-11-30 |
PDF 13211Kb |
| Cambridge SWM Facility Location Plan and Associated Drainage Areas |
| 2007-11-30 |
PDF 5926Kb |
| Cambridge SWM - Flooding Locations |
| 2007-11-30 |
PDF 13381Kb |
| Design and Construction |
| 2011 Capital Projects |
| 2011-07-05 |
PDF 345Kb |
| Engineering Services - Site Plan |
| Water Customer Data Sheets |
| 2012-01-06 |
PDF 176Kb |
| Letter of Compliance - Grading |
| 2009-02-04 |
PDF 12Kb |
| Letter of Compliance SWM |
| 2009-02-04 |
PDF 12Kb |
| General |
| Bicycle Parking Guide |
The purpose of this guide is to provide guidance on the proper design and implementation of short-term bicycle parking. | 2012-01-23 |
PDF 834Kb |
| Water Meter Chamber 250b 1 of 2 |
| 2011-12-16 |
PDF 440Kb |
| Water Meter Chamber 150-200b 1 of 2 |
Water Meter Chamber 150-200b 1 of 2 | 2011-12-02 |
PDF 357Kb |
| Water Meter Chamber 150-200b 2 of 2 |
water meter chamber 150-200b 2 of 2 | 2011-12-02 |
PDF 421Kb |
| Bikeway Network Map Sept 2011 |
Bikeway Network Map Sept 2011 | 2011-09-29 |
PDF 2401Kb |
| Notice of Study Completion |
City-wide comprehensive Stormwater Management Master Plan to develop plans and strategies to manage the City's infrastructure related to flooding and stormwater quality. | 2011-08-29 |
PDF 23Kb |
| Local Cycling Events |
Local Cycling Events | 2011-05-05 |
PDF 157Kb |
| Application for Highway Occupancy Permit |
Application for Highway Occupancy Permit | 2011-04-28 |
RTF 5609Kb |
| Highway Occupancy Major/Minor List |
Highway Occupancy Major/Minor List - this list determines the value of the permit as indicated by the tasks involved | 2011-04-28 |
PDF 15Kb |
| Highway Occupancy - Sample of Traffic Control Layout for Dumpsters |
Highway Occupancy - Sample of Traffic Control Layout for Dumpsters | 2011-04-28 |
PDF 12Kb |
| Water Meter Chamber 16-50 1 of 2 |
| 2011-04-28 |
PDF 273Kb |
| Water Meter Chamber 16-50 2 of 2 |
Water Meter Chamber 16-50 2 of 2 | 2011-04-28 |
PDF 356Kb |
| Water Meter Chamber 150-200a 1 of 2 |
Water Meter Chamber 150-200a 1 of 2 | 2011-04-28 |
PDF 371Kb |
| Water Meter Chamber 150-200a 2 of 2 |
Water Meter Chamber 150-200a 2 of 2 | 2011-04-28 |
PDF 451Kb |
| Water Meter Chamber 250b 2 of 2 |
Water Meter Chamber 250b 2 of 2 | 2011-04-28 |
PDF 423Kb |
| Driveway Approach Application |
Driveway Approach Application | 2011-04-26 |
PDF 57Kb |
| Region of Waterloo Pedestrian Charter |
Region of Waterloo Pedestrian Charter | 2011-04-01 |
PDF 581Kb |
| 10 Cycling Safety Tips for Cyclists |
10 Cycling Safety Tips for Cyclists | 2011-03-14 |
PDF 182Kb |
| 10 Cycling Safety Tips for Motorists |
10 Cycling Safety Tips for Motorists | 2011-03-14 |
PDF 179Kb |
| Cambridge Bikeway Network Master Plan |
Cambridge Bikeway Network Master Plan | 2011-03-14 |
PDF 11930Kb |
| Planned Projects |
Planned Projects | 2011-03-14 |
PDF 440Kb |
| On-road Cycling Facility Types |
This document provides a written, as well as visual description of the various on-road cycling facility types within Cambridge. | 2010-09-15 |
PDF 395Kb |
| Asset Management Presentation by Mike Hausser |
The City of Cambridge was recently recognized as Canada's first smarter city by IBM. View the presentation on the knowledge-based system the municipality has engage to management more than $1 billion in assets. | 2010-09-09 |
PDF 1359Kb |
| IBM Presents on Smarter Cities |
Leading the way for Canadian municipalities, IBM today named Cambridge the first smarter city in the nation. Mike Marsonet from IBM delivered this presentation at the press conference and technology showcase. | 2010-09-09 |
PDF 884Kb |
| Hwy 401 Ped Bridge Part 2A |
Presentation from Hwy. 401 Ped/Cyclist Bridge Feasibility Study - PIC #2 Nov. 19 | 2009-12-04 |
PDF 574Kb |
| Hwy 401 Ped Bridge Part 2B |
Presentation from Hwy 401 Ped/Cyclist Bridge Feasibility Study - PIC#2 Nov. 19 | 2009-12-04 |
PDF 7660Kb |
| Hwy 401 Ped Bridge Part 3A |
Presentation from Hwy 401 Ped/Cyclist Bridge Feasibility Study - PIC #2 Nov. 19 | 2009-12-04 |
296Kb |
| Hwy 401 Ped Bridge Part 3B |
Presentation from Hwy. 401 Ped/Cyclist Bridge Feasibility Study - PIC #2 Nov. 19 | 2009-12-04 |
PDF 2104Kb |
| Hwy 401 Ped Bridge Part 3C |
Presentation from Hwy 401 Ped/Cyclist Bridge Feasibility Study - PIC #2 Nov. 19 | 2009-12-04 |
PDF 787Kb |
| Hwy 401 Ped Bridge Part 3D |
Presentation from Hwy 401 Ped/Cyclist Bridge Feasibility Study - PIC#2 Nov. 19 | 2009-12-04 |
PDF 2936Kb |
| Hwy 401 Ped Bridge Part 3E |
Presentation from Hwy 401 Ped/Cyclist Bridge Feasibility Study - PIC #2 Nov. 19 | 2009-12-04 |
PDF 290Kb |
| Hwy. 401 Ped & Cyclist Bridge PIC #2 Comment Sheet - Nov. 19 |
Comment Sheet from the Nov. 19 PIC | 2009-11-20 |
PDF 109Kb |
| Hwy 401 Ped Bridge Part 1 |
Presentation from Hwy 401 Ped/Cyclist Bridge Feasibility Study - PIC #2 Nov. 19 | 2009-11-20 |
PDF 3655Kb |
| Salting and Sanding Practices |
| 2009-11-16 |
PDF 25Kb |
| Plan for Improved Winter Maintenance Services |
| 2009-11-11 |
PDF 33Kb |
| Hwy. 401 Pedestrian & Cyclist Bridge Feasibility Study - Comment Sheet |
Comment Sheet | 2009-07-02 |
PDF 621Kb |
| Hwy. 401 Pedestrian & Cyclist Feasibility Study - Comment Sheet |
Comment Sheet | 2009-06-30 |
PDF 621Kb |
| Hwy. 401 Pedestrian & Cyclist Bridge Feasibility Study |
PIC #1 Display Boards | 2009-06-30 |
PDF 2240Kb |
| Hwy. 401 Pedestrian and Cyclist Bridge Public Information Centre - Notice of Study Commencement |
| 2009-06-23 |
PDF 130Kb |
| Stormwater Management PIC #1 |
| 2009-05-13 |
PDF 6Kb |
| Asset Management-Water System |
| 2009-05-04 |
PDF 41Kb |
| Asset Management-Sanitary Sewer System |
| 2009-05-04 |
PDF 36Kb |
| Core Areas Parking Master Plan - Final Report with Executive Summary |
| 2009-04-16 |
PDF 4380Kb |
| Core Areas Parking Master Plan - Final Report with Consultation Summary Appendix A |
| 2009-04-16 |
PDF 43Kb |
| Core Areas Parking Master Plan - Final Report Appendix B |
| 2009-04-16 |
PDF 2306Kb |
| Core Areas Parking Master Plan - Final Report Appendix C |
| 2009-04-16 |
PDF 4664Kb |
| Core Areas Parking Master Plan - Final Report Appendix D - evaluation tables |
| 2009-04-16 |
PDF 32Kb |
| Pothole Hotline Info. |
| 2009-02-24 |
PDF 17Kb |
| Core Areas Parking Master Plan PIC#2 January 27-29 Public Display Boards |
| 2009-02-04 |
PDF 2321Kb |
| Riverbank Drive Traffic Calming Study |
| 2009-02-02 |
PDF 8422Kb |
| West River Road Traffic Calming Study |
| 2009-01-30 |
PDF 5778Kb |
| Core Areas Parking Master Plan - Notice of Public Information Centres |
| 2009-01-27 |
PDF 23Kb |
| Parking Survey Methodology and Results |
| 2008-10-06 |
PDF 4702Kb |
| Background Data Report |
| 2008-10-06 |
PDF 2308Kb |
| Public Consultation Summary Report |
| 2008-10-06 |
PDF 1810Kb |
| Riverbank Drive PIC #2 Comment Sheet |
| 2008-09-18 |
PDF 3315Kb |
| Core Areas Parking Master Plan - June 18 Public Information Centre |
| 2008-06-24 |
PDF 1237Kb |
| Notice of Public Information Centre - Class Environmental Assessment Stormwater Management Master Plan |
| 2007-11-23 |
PDF 16Kb |
| General Communications |
| Stormwater Master Plan |
Capital programs to address the City's important drainage infrastructure needs | 2011-08-29 |
PDF 802Kb |
| Grand River Transit Enhances Services in Cambridge |
Grand River Transit (GRT) in Cambridge, Kitchener and Waterloo, has implemented a number of new initiatives to improve riders' experiences on the regional transit system. | 2009-05-21 |
PDF 17Kb |
| Guelph Avenue Schedule "B" Class Environmental Assessment and Preliminary Design |
| Guelph Avenue EA Notice of Study Completion |
| 2008-04-15 |
PDF 45Kb |
| Maps - Transp. & Public Works |
| Sidewalk Snow Clearing Map 2010-2011 |
Sidewalks, Trails and walkways maintained by the City of Cambridge. Detailed map showing areas Community Services and Public Works maintains. | 2012-01-17 |
PDF 2781Kb |
| Galt City Centre Parking Map |
The City of Cambridge has three downtown cores. This map gives details on the many parking options in Galt City Centre | 2012-01-04 |
PDF 230Kb |
| Hespeler Village Public Parking |
The City of Cambridge has three downtown cores. This map gives details on the many parking options in Hespeler Village. | 2012-01-04 |
PDF 129Kb |
| Preston Towne Centre Public Parking |
The City of Cambridge has three downtown cores. This map gives details on the many options for parking in Preston Towne Centre. | 2012-01-04 |
PDF 135Kb |
| Road Resurface Map |
| 2010-06-05 |
PDF 760Kb |
| Hwy. 401 Pedestrian & Cyclist Bridge Feasibility Study - Comment Sheet |
Comment Sheet | 2009-06-30 |
PDF 621Kb |
| Right of Way Study |
| Sub Standard Right-of-Way Study PIC #1 Jan 17-19, 2012 |
The goal of this study is to produce design standards that provide for safe, efficient, effective and environmentally sustainable transportation corridors within limited spaces. | 2012-01-30 |
PDF 1350Kb |
| Study Outline and Questionnaire |
A form to input substandard right of way issues and the public's value of these issues. | 2012-01-30 |
PDF 514Kb |
| Sewer and Water Rates |
| 2011 Water & Sewer Rates |
the manner in which the 2011 Water and Sewer rates are calculated and disbursed | 2011-02-15 |
PDF 56Kb |
| Council Resolution for Water and Waste Water Long Range Financial Plan |
This document shows the resolution that was passed by City of Cambridge Council regarding the Water and Waste Water Long Range Financial Plan. | 2010-06-18 |
PDF 17Kb |
| City of Cambridge Water and Waste Water Long Range Financial Plan & Council Report |
This document includes the final report for the long range financial plan for the City of Cambridge's Water and Waste Water, as well as the Council report submitted for same. | 2010-06-18 |
PDF 2656Kb |
| Determining 2010 Fixed Water and Sewer Rates in Cambridge |
Details on fixed charges for your water/sewer bill. | 2010-04-12 |
PDF 27Kb |
| Special Collections - Leaf Collection |
| Leaf Pick Up Program 2011 Map |
The 2011 Leaf Pick Up Program begins Nov 7, 2011. The leaf pick up program map outlining leaf collection areas, leaf vac and sweeper routes. | 2011-10-21 |
PDF 1995Kb |
| Special Events |
| Source Water Protection Public Engagement Session |
Public Consultation Sessions Nov 2011: Your Chance to Provide Input | 2011-11-02 |
PDF 118Kb |
| Special Events Permit Application |
Please note that the fee for a Special Event Permit changes annually. To ensure that you have the most current info. for the permit fee, please contact (519)621-0740 ext. 4551. | 2010-03-24 |
PDF 2201Kb |
| Special Event Permit Policy |
The Special Event Permit Policy sets out authority and permit process for Special Events. | 2007-02-28 |
PDF 92Kb |
| Water Reports |
| 2010 Annual Summary Report |
2010 Annual Summary Report | 2011-02-15 |
PDF 93Kb |
| 2009 Annual Summary Water Report |
| 2010-02-22 |
PDF 95Kb |
| 2008 Annual Summary Water Report |
| 2009-02-25 |
PDF 223Kb |
| 2007 Summary/Annual Water Report |
| 2008-03-05 |
PDF 238Kb |
| 2006 Summary/Annual Water Report |
| 2008-03-05 |
PDF 229Kb |
| 2005 Water Summary Report |
| 2006-03-29 |
PDF 117Kb |
| City of Cambridge - 2005 Annual Drinking Water Report |
| 2006-03-01 |
PDF 61Kb |