City Departments

Conestoga College South Campus and Blair Business Park Notice of Completion Re: Sanitary Sewer Servicing

"NOTICE OF COMPLETION"

Conestoga College South Campus and Blair Business Park
Sanitary Sewer Servicing Class E.A. Study Schedule "B"

The City of Cambridge has completed a Sanitary Sewer Servicing Class EA Study -Schedule "B" Project for the servicing of the Conestoga College South Campus and Blair Business Park. The study was completed in compliance with a Schedule "B" undertaking following the requirements of the Municipal Engineers Association, Class Environmental Assessment for Municipal Roads, Water and Wastewater Projects (as amended). A preferred solution was identified which includes the following: location for a gravity sewer system from Blair Business Park to the proposed pumping station location: a sanitary pumping station located northwest corner of Fountain Street at Morningside Drive; and a sanitary forcemain routing along Morningside Drive crossing Highway # 401, then crossing Conestoga College Doon Campus, continuing along Doon Valley Drive and Old Mill Road to the trail along the Grand River and to the Kitchener Wastewater Treatment Plant.

Notice of Completion



Click here for the larger PDF version of the map




An Environmental Study Report has been prepared and is available for public review as follows:

Clerks Department:
City of Cambridge, 50 Dickson St., 2nd Floor
Cambridge, ON N1R 5W8
Mon-Fri: 8:30 a.m.-4:30 p.m. Tel:519.740.4680

Planning Services Department
City of Cambridge, 50 Dickson St., 3rd Floor
Cambridge, ON N1R 5W8
Mon-Fri: 8:30 a.m.-4:30 p.m. Tel:519.740.4650

Clerks Department:
City of Kitchener, 2nd Floor, 200 King St. W.
Kitchener, ON N2G 4G7
Mon-Fri: 8:30 a.m.-4:30 p.m. Tel: 519.741.2276

Queen's Square (Central) Library
1 North Square, Cambridge, ON N1P 1A1
Mon-Thurs: 9:30 a.m.-8:25 p.m.
Fri-Sat: 9:30 a.m.-5:25 p.m., Sun: 1p.m.-4:55p.m.
Tel: 519.621.0460

Preston Library
435 King Street East, Cambridge, ON N3H 3N1
Mon-Thurs: Noon-8:30 p.m., Fri: Noon-5:30 p.m.
Sat: 9:30 a.m.-5:30 p.m., Sun: 1p.m.-5p.m.
Tel: 519.653.3632

Kitchener Public Library, Pioneer Park Branch
150 Pioneer Park Drive, Kitchener, ON N2P 2C2
Mon-Thurs: 9:30 a.m.-9 p.m.
Fri: 9:30 a.m.-5:30 p.m., Sat: 9 a.m.-5:30 p.m.
Tel: 519-748-2740

Interested persons should provide written comments to the City of Cambridge by November 30th, 2009 (within 30 days of notice date) Comments should be directed to the individuals listed below.

Mr. Giancarlo Radicioni, P.Eng.
Senior Development Engineer Projects
City of Cambridge
50 Dickson Street, 3rd Floor
P.O. Box 669, Cambridge, ON, N1R 5W8
Ph: (519) 740-4650, Ext. 4538, Fax: (519) 622-6184

or

Mr. Angelo J. Innocente, CET
Senior Project Manager
MTE Consultants Inc.
520 Bingemans Centre Drive
Kitchener, ON N2K 3S2
Ph: (519) 743-6500, Fax: (519) 743-6513

If concerns arise regarding this project which cannot be resolved in discussion with the City of Cambridge, a person or party may request that the Minister of the Environment make an order for the project to comply with Part II of the Environmental Assessment Act (referred to as a Part II Order), which addresses individual environmental assessments. Requests must be received by the Minister at the address below within 30 calendar days of this Notice. A copy of the request must also be sent to the City of Cambridge at the address noted above. If there is no "request" received by November 30th, 2009, the Conestoga College South Campus and Blair Business Park Sanitary Servicing as presented in this EA Study, will proceed to design and construction.

The Honourable John Gerretsen
Minister of the Environment
12th Floor, 135 St. Clair Avenue West
Toronto, ON, M4V 1P5

This notice first issued on October 30th, 2009

Related Documents

DOCUMENT DESCRIPTION DATE POSTED  
General
Map Complete Map Related to Conestoga College South Campus and Blair Business Park Notice of Completion Re: Sanitary Sewer Servicing 2009-11-02 PDF 121Kb
Appendix B - Technical Steering Committee Minutes of Meetings Final Report detailing preferred alignment for sanitary servicing of Conestoga South Campus and Blair Business Park. 2009-10-28 PDF 1588Kb
Appendix C - Public Open House Notices and Comments Appendix C - Public Open House Notices and Comments related to Conestoga College and Blair Business Park Sanitary Servicing. 2009-10-28 PDF 2724Kb
Appendix D - Agency Municipal and Property Owner Correspondence and Documents Appendix D - Agency Municipal and Property Owner Correspondence and Documents related to Conestoga College South Campus and Blair Busines Park Sanitary Sewer Servicing. 2009-10-28 PDF 2641Kb
Appendix E_Preliminary Cost Estimates Appendix E_Preliminary Cost Estimates related to Conestoga College South Campus and Blair Business Park Notice of Sanitary Sewer Servicing 2009-10-28 PDF 215Kb
Executive Summary_Recommendations and Report Executive Summary_Recommendations and Report related to Conestoga College South Campus and Blair Business Park Notice of Sanitary Servicing 2009-10-28 PDF 227Kb
Sanitary Servicing of Conestoga South Campus and Blair Rd Business Park Final Reports Detailing Preferred Alignment for Sanitary Servicing of Conestoga College, South Campus and Blair Road Business Park. 2009-10-26 PDF 6590Kb